DESIGNING, INSTALLING AND PROVIDING THE MEASUREMENT– CONTROL – PROTECTION CABINET MEETING THE AUTOMATIC CONTROL CRITERIAS OF SUBSTATION AND POWER PLANT

NPCETC’s strategy and target: By 2020, the science and information technology application level of our employees on power grid automation will become indus- try-leading. The NPCETC determines and considers the applications of science and technology from the fourth industrial revolution as one of the most important motivations for development. Therefore, over the past few years, NPCETC has step by step completed and mastered DCS, SCADA / EMS / DMS, intelligent counting system... in adjusting power grid and power plant system.

1 Consulting and designing computer system for transformers and power plant

2 Installing and establishing the hardware of control computer system

3 Installing the software system

4 Building database

5 Connecting equipments to the central control system. Testing in Point to Point signa

6 Connecting the equipments of the substation and power plant to operations control center. Testing End to End signal

7 Designing, installing and providing measurement - control - protection cabinet system meeting the automatic control critetia of substation and power plant

 
 

SOME OF TYPICAL PHOTOS

 
Tự động hóa hệ thống điện 01

Establish operations control center

Thí nghiệm hệ thống, thiết bị thứ cấp

Establish control system by computer at 110kV substation

Thí nghiệm phân tích mẫu đầu

Establish SCADA system

WHY CHOOSE NPCETC??

OVERVIEW OF COMPANY CAPACITY

NPCETC applies science and technology on the design, installation and configuration of computer control system in substations, power plants and operations control centers. NPCETC has cooperated with other NPCETC subsidiaries and big power grid technology companies in the world such as SIEMENS, SCHNEIDER, GE, ALSTOM ... to bring into the power grid system of Vietnam the most advanced technologies, thus to step by step modernize the Vietnam Power System.

1 Completed projects

Establish and put into operation the operations control centers of 110 kV substations:

- Completed: Operations control centers in 8 provinces: Ha Nam, Hung Yen, Thai Nguyen, Ha Tinh, Hoa Binh, Son La, Bac Ninh, Vinh Phuc;

- Ongoing: Operations control center in 10 provinces: Bac Giang, Lao Cai, Nam Dinh, Nghe An, Phu Tho, Quang Ninh, Thai Binh, Thanh Hoa, Tuyen Quang and Yen Bai;

- Technical assistance for the construction of operations control center in Hai Duong and Hai Phong.

 

Renovate and connect the automatic 110kV substation:

- Renovate compeletely and put into operation 56 automatic 110kV substations;

- Renovating and connecting more than 55 substations to become automatic substations.

 

Monitor and connect over 1000 Reclosers on the medium voltage grid into the control center

 

Configure dozens of integrated 110kV substations.

2 Employees

The human resources consists of 54 highly qualified employees with intensive experience in power system automation. NPCETC engineers can configure, install and set up database of control systems intergrated with substation, such as:

- SIEMENS’s SICAM PAS system;

- Schneider's PACIS system;

- GE’s PLA PLC system;

- ABB’s Micro SCADA system;

- ABB’s Micro SCADA system;

- The COPA-DATA’s ZENON system.

3 Equipments and technologies

NPCETC uses specialized available equipments such as Omicron CMC 356, Svecker 760,... and licensed software to test protocols such as IED Scout, IEC Test...

PERSONNEL CAPACITY

Considering personnel as the core of sustainable development, NPCETC always focus on investing and developing human factor and improving the quality of human resources.

NPCETC owns a well-qualified and experienced personnel thanks to a rigorous recruiting process. In addition, NPCETC's personnel are trained by prestigious training institutions in the world such as Siemens, Schneider, GE, ABB, Alstom, Omicron, Haefely Hipotronics, Pulsar, Megger, Phoenix, Vanguard...

nang luc nhan su

In addition to studying the world's leading integrated control systems, NPCETC has invested in equipment to actively serve Point to Point and End to End signals test. The equipments are manufactured by leading brands such as Omicron,... Megger from countries Austria, USA, etc.,to help NPCETC engineers simulate the scenarios that can occur during the operation of the power system, thus preventing possible damage.

thi nghiem tieu bieu
CMC 356 /Switzerland (Relay test set)
thi nghiem tieu bieu
IED Scout/Omicron (Licensed protocols software)
thi nghiem tieu bieu
IEC Test (IEC test software)
 
 

PROJECT DESCRIPTION

 
With strong human resources and equipment capability, over the course of three years (2015-2017), NPCETC has consistently received projects related to integrated control systems throughout cities of North Vietnam with the number as follows:
8 operations control centers
SCADA system of Lai Chau, Son La, Ban Chat hydropower plant...
Substations: 110kV Yen Binh 2, 110kV Tam Nong, 110kV Sapa, 110kV Tan Quang, 110kV Go Trau...
Recloser system on medium Voltage grid of Bac Ninh province
Recloser system on medium voltage electrical network of Son La province
 
thi nghiem tieu bieu
Exchange with international partners about grid automation program
thi nghiem tieu bieu
Establish operations control center in Thai Nguyen province
thi nghiem tieu bieu
Establish operations control center in Ha Tinh province
thi nghiem tieu bieu
Establish operations control center in Hung Yen province
 
thi nghiem tieu bieu
Establish operations control center in Son La province
thi nghiem tieu bieu
Establish control system by computer of 110kV Yen Binh 2 substation
thi nghiem tieu bieu
Establish control system by computer of 110kV Tan Quang substation
thi nghiem tieu bieu
Establish SCADA system in Son La hydropower plant
   


TYPICAL CUSTOMERS

Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
Doi tac module 1
You did not use the site, Click here to remain logged. Timeout: 60 second