ABOUT US

Gioi thieu ETC

Open letter

Over the past 50 years of formation and development, NPCETC has carried out calibration tests and put into operation for almost all thermal power plants, hydropower plants and substations up to 500kV in North Vietnam.

The core strength of our company has been built by the high quality of our own services which include the main categories as follows:

1. Testing and commissioning of the substations with voltage up to 500 kV;
2. Automation of electrical system;
3. Testing and commissioning of the technological equipments at thermal power plants and hydropower plants;
4. Verification of measuring devices, calibration of electrical and thermal equipments and technical management of power measuring systems;
5. Type and advanced tests of transformers, electrical wire and cable sample, and lightning arrester;
6. Design, supply and installation of measurement, control, protection cabinets at substations and power plants;

7. Energy Audit, Industrial Boiler Performance Testing ...

With experienced and enthusiastic specialists and engineers, the most modern equipments which have been invested methodically and the quality management system, NPCETC committed to execute projects under the motto of Safety - Quality - Effectiveness. Our company always holds a strong brand and be trusted by customers to choose and use the service.

 

DIRECTOR

Chu ky new

Nguyen Quang Khanh

Company Milestones

1971 - 1975

1971: Establishment of Electricity Testing Center 1 (now NPCETC)

Power plants: Uong Bi, Vinh, Ninh Binh, Thac Ba... 110kV

Substations: Dong Anh, Ha Dong, An Lac, Mong Duong, Trinh Xuyen...

1975 - 1990

Uong Bi Thermal Power Plant: expanding 2 more units 2x50MW

Pha Lai Thermal Power Plant: 4 units of 4x110MW

Hoa Binh Hydropower Plant: 8 units of 8x240 MW

Tien Hai Gas Turbine Power Plant (Thai Binh).

110kV substation: Tuyen Quang, Tien Yen…

1990 - 2000

North-South 500kV Transmission Line: 500kV Ha Tinh, Ninh Binh 500kV, 500kV Hoa Binh...

220kV substation: 220kV Chem, 220kV Mai Dong, 220kV Ha Dong...

All 110kV substation in the North such as: 110kV Bai Bang, 110KV Hoang Thach...

Hydropower plant: Thac Bay, Thoong Got, Song Hinh...

2000 to present

500kV substation: 500kV Son La; 500kv Nho Quan, 500kv Thuong Tin, 500kV Quang Ninh, 500kV substation Hiep Hoa, 500kV Vung Ang 1 thermal power plant, 500kV Mong Duong 1 thermal power plant...

220kV substation: Bac Ninh, Hai Ha, Dong Anh, Long Bien, Son La, Bim Son...

110kV substation: Que Vo, Minh Duc, Nam Tha, Vinh Yen, Vinh Tuong, Dai Tu...

Hydroelectric hydropower plants: Son La, Lai Chau, Ban Chat, Huoi Quang, Trung Son, Bao Lam 1, Bao Lam 3, Ban Ve...

Thermal power plant: Hai Phong, Quang Ninh, Pha Lai, Mao Khe, Nong Son, Cam Pha, Son Dong, Cao Ngan, Na Duong...

Vision

Maintaining strong brand position, being the leading company in testing and commissioning, verification in Vietnam and reaching out to the regional;

Always being the a reliable choose of all customers to use the service.

Mission

Ensuring the safe, continuous and stable operation of electricity supply to serve not only customers in business but also politic, security and defense, culture and diplomacy activities taking place in the North of the Party and the country.

Improving the quality of service to increase business efficiency and the brand value.

CORE VALUES

STANDARD PROCESS
NPCETC staffs always follow the standard system set by the company in, testing and commissioning, etc., to ensure that these systems equipment meet the safety and technical standards set by Vietnam Electricity and Vietnam Law.
STANDARD QUALITY
NPCECT has a long history with many years of experience, and is granted the certificate of quality standards: Quality management system certified the ISO 9001- 2015/ISO 9001-2015 by the Directorate for Standards, Metrology and Quality.


The laboratory is recognized to complies with the ISO/ IEC17025-2005 standard recognized by the Ministry of Science and Technology


Technical safety testing of electrical equipments and instruments certified by the Ministry of Industry and Trade (MOIT) No. 3511/GCNHDKD-BCT dated 12/9/2017;


Verification, calibration, testing activities of Measurement equipment measurement equipment appointed by the Directorate for Standards, Metrology and Quality;


Vietnam National Productivity Institute Certificate for 5S standard...


NPCETC always strives to build trust of customers by quality products, quality services provided by NPCETC.
DEDICATED SERVICE
NPCETC has built a team of dedicated staff with high responsibility for work as well as the social community. NPCETC employees are always whole - hearted to devote the strength and intellect in serving and cooperating with customers to provide the best service and to bring satisfaction to partners and customers, to ensure all projects and works follow the motto of “Safety - Quality - Efficiency”.
CONNECT FOR POWER
NPCETC always appreciates the connection between partners and the company. We believe that connection on the spirit of respect, equality, trust and sharing is the foundation for the development and success of both.
NPCETC also appreciates the close cooperation among the staffs. The solidarity of the employees will promote the collective strength, create higher cumulative value, thus will promote the development of the company.